American River Pump Station Phase II

Project Information
Project Name:
American River PS Phase II 2591
Project Owner:
PCWA/US Bureau of Reclamation
Project Engineer:
Jim Phillips; JPS Automation
Project Start Date:
September 2006
Project End Date:
January 2008
Project Value:
15000
General Contractor:
Ford Construction
Electrical Contractor:
Central Sierra Electric
System Highlights
The American River project entailed construction of an intake structure to draw water form the American River as well as a pump station to pump the water up a hill to a tunnel leading to PCWA's Foothill Water Treatment Plant.
Our portion, Phase II, included control of the intake gates and valves as well as a back wash system for the intake screens. This required close coordination with a direct competitor who was responsible for all PLC and SCADA programming on the project.