Placer County Water Agency SCADA System Upgrade Project [1]
Placer County Water Agency (PCWA) awarded MCC a contract to upgrade their SCADA system. The scope of the project was to upgrade their existing Fix 32 SCADA system and implement new iFix systems. PCWA has total 8 treatment plants spread over 100 miles range in Placer County, California.
City of Manteca – WQCF Phase III Expansion [1]
This project includes the best technology availible to protect the public from viruses and pathogens. It will virtually eliminate disinfection by-products for the city's waterwater that may impact human health.
In addition, Manteca's new facility will actually help mitigate the low disolved oxygen problems in the Stockton Shp Channel, which invreases the City's opportunities to use recycled water.
This project was designed to protect human, plant and animal life in the San Joaquin River.
Paseo Padre [1]
The City of Fremont is leading a project to construct and underpass on the Paseo Padre Parkway between Shadowbrooke Common Road and Hancock Drive.
MCC Control Systems will be provideing the MCC with pump control to remove groundwater from the under pass.
MCC Control Systems will assist with the implementation and the testing of the pump controls.
American River Pump Station Phase II [1]
Our portion, Phase II, included control of the intake gates and valves as well as a back wash system for the intake screens. This required close coordination with a direct competitor who was responsible for all PLC and SCADA programming on the project.